order to undertake this work safely, a full closure of the Don Valley
Parkway will be required.
to the Gardiner Expressway from Saturday, April 24 at 2 a.m. to Monday,
April 26 at 5 a.m.
. spring catchbasin cleaning (required to ensure proper drainage)
. pavement markings and sign maintenance
. guiderail and asphalt repair
. railway bridge inspection
. ramp realignment for bridge rehabilitation
. closed-circuit television (CCTV) camera maintenance
. installation of a new changeable message sign, and
. expressway sweeping operations and litter removal.
conditions on the Don Valley Parkway," said Gary Welsh, General Manager,
Transportation Services. "Motorists should be advised to be patient and
make sure to take extra time to get to and from their destinations."
Kingston Road as alternative routes during the closure. Whenever possible,
the public is encouraged to consider using public transit as a convenient
alternative.
website at http://www.toronto.ca/transportation.
a diverse population of about 2.6 million people. It is the economic
engine of Canada and one of the greenest and most creative cities in North
America.
efficiency in delivering public services. Toronto's government is
dedicated to prosperity, opportunity and liveability for all its
residents. For information about non-emergency City services and programs,
Toronto residents, businesses and visitors can dial 311, 24 hours a day, 7
days a week.



